INNOVATIONS TIMELINE

PROCESS INNOVATIONS

  • Implementation of waterproof Ipad for quality check input
  • New ERP with production management system
  • -------------------------------------------
  • -------------------------------------------
  • Design and construction of the first measuring-tubing machine
  • Development of the first plastic marble machine
  • Development of the first machine for BOA tube manufacturing
  • -------------------------------------------
  • 2012
  • 2011
  • 2008
  • 2004
  • 1998
  • 1987
  • 1985
  • 1984

PRODUCT INNOVATIONS

  • -------------------------------------------
  • -------------------------------------------
  • Introduction of the 50-yard/45-meter long BOA System tube
  • Patent on dry stick natural casings - up to 22 yards/20 meters in calibers 28 to 100 https://www.youtube.com/watch?v=tSiqLROUfPI&feature=youtu.be
  • -------------------------------------------
  • -------------------------------------------
  • Patent on the first 20-yard/18-meter long BOA System tube